The electrical in a new home is a hundred decisions that are cheap on paper and expensive after drywall. We come in early — panel sizing, circuit layout, lighting design, EV and generator readiness — then deliver clean rough-ins and finals that pass inspection the first time.
Decisions worth making before drywall
Two-hundred-amp service even if today’s loads don’t demand it. Conduit stubs for the EV charger and the future array. A generator interlock while the panel is open. Lighting circuits designed for how rooms are used, not just code minimums. Every one of these costs a fraction at rough-in of what it costs later — our design review catches them while they’re cheap.
A sub your builder can schedule around
Rough-in when framing is ready, not a week after. Inspections booked ahead, walkthroughs before cover, and finals that don’t hold up the CO. We build for GCs and owner-builders across the region, and repeat business is the whole model.
Working with your builder, from plans to punch list
Good new-construction electrical is mostly logistics: being on site when framing is ready, roughing in clean and labeled, passing the cover inspection on the first walk, and never being the trade the schedule waits on. The GCs we work with keep calling because the electrical line on their schedule behaves — bids come back on time and scoped line by line, RFIs get answered same-day, and our rough-ins photograph well enough that more than one builder has used them in marketing.
For owner-builders, we add a layer of translation: we'll walk the plans with you, explain the choices in plain language, and flag the decisions worth making before drywall — because on a new build, the cheapest week to change anything electrical is always this week.
Building for the Adirondack site
New construction here comes with terrain. Long driveways mean underground service runs and trenching coordination. Remote sites raise the generator and solar conversations early, while the excavator is still on site. Camps and lake houses add dock feeds, boathouse power, and exterior lighting that respects the dark sky. And every build gets our climate defaults: service sized for electrification, conduit stubs to the garage and roof, heat-tape circuits designed in rather than stapled on later.
The result is a house that doesn't need its first electrical retrofit five years in — because the next decade's projects were roughed in while the walls were open.
What's included
- Design-stage review: service sizing, circuit and lighting plan
- Future-proofing: EV, solar, generator, and smart-home rough-ins
- Clean, labeled rough-ins that pass on the first walk
- Low-voltage: network, AV, and security rough-in in the same pass
- Coordinated scheduling with your builder
- Finals, fixture install, and a labeled panel at handoff
New Construction Wiring: questions we hear
When should the electrician get involved in a new build?
What size service should a new home have?
Can you rough in for things we’ll add later?
Do you handle the utility connection for a new build in the Tri-Lakes area?
Do you wire additions and major renovations too?
What does new-construction wiring cost?
Where we do this work
New Construction Wiring for builders, homeowners, and businesses across 54 towns in Upstate New York — see all service areas.